top of page

Reconstruction of E20, Götene-Mariestad involved several companies from Qflow

Project description

Road E20 between Mariestad and Götene, a 20 km stretch currently built to two-lane standard, will be upgraded to a divided road with a median barrier and a speed limit of 100 km/h. The new road standard means a 2+2 road with grade-separated junctions, improving accessibility and road safety for both heavy and local traffic. The project, financed through the national plan and co-financing, is part of a larger goal to make the entire E20 through Västra Götaland a divided road, reducing accident risks and environmental impact for local residents.


Work from companies in the group:


Mark was responsible for the planning phase of the project and is now providing construction support during the ongoing implementation process.


Inhouse Tech identified oversized bridge structures, which led to proposals for reduced amounts of concrete, reinforcement, shaft and pavement. For 14 bridges, 7 of which were originally double-span bridges as shown in Figure 1, Inhouse Tech presented an alternative as shown in Figure 2 that the Swedish Transport Administration adopted to save on the environment. This solution resulted in significant environmental savings and a more sustainable construction.


Picture 1




Picture 2



We delivered